2014 Recap

The Foundation is working with the county to encourage the continued restoration of the property. To that end, the foundation secured a Chesapeake Bay Trust Living Shoreline Grant for design and engineering a shoreline. We have secured the services of a design firm and are expecting a plan in the Spring of 2015.

Concept-12-22-09

Below is an aerial indicating shoreline erosion since 1976. The orange line shows 1976 and the pink line depicts the 2010 shoreline.

1976_shoreline

Low-tide showing eroding shoreline.

Low-tide low-tide2